NEC PRODUCTS

Contracts
Books
Digital
Training
Events
Users' Group
Consultancy
Academia
eNews Sign Up
Sign up here for our eNews

* Enter the code

 


Downloads
Quick Links
RSS Newsfeeds
RSS newsfeedRSS/XML feeds can provide you with the latest news, as they are added to the NEC.

Find further information and how to get started with RSS newsfeeds

NECD


You are here: NEC : Products : Contracts : NECD

The NECD provides electronic access to the Engineering and Construction Contract 2nd Edition and Subcontract clauses, Guidance Notes and Flowcharts. Each document has full indexing by keywords and phrases, that gives you the ability to search within the documents quickly and easily. You can also switch between the documents by simple hypertext links and can now create, transmit and print electronic files of contract data. This extraordinary software enables you to follow the decision processes of the contract by moving from box to box through the interactive, colour coded Flowcharts.

This unique contract software will provide an invaluable resource that is simple to use, clear in layout and has extensive functionality, which will help ensure the contractual process is successful between all parties involved.

The NECD pricing structure is as follows:

  • 1 - 5 £145 plus VAT per annual licence per PC
  • 6 - 10 £135 plus VAT per annual licence per PC
  • 11 - 23 £130 plus VAT per annual licence per PC
  • 24 or more £3000 flat fee plus VAT

Contents
The NECD includes:

  • The Engineering and Construction Contract 2nd Edition
  • The ECC Options A to F
  • The Engineering and Construction Subcontract 2nd Edition
  • The ECC Guidance Notes
  • The ECC Flowcharts

Inside the packaging you will find simple step-by-step guidance explaining how to install the NECD onto your desktop and a quick-reference guide to the NECD.

Demo
The NECD is available as a free demonstration download. This allows all the features to be accessed on a restricted number of clauses. Full access can be obtained by taking out a licence and inputting a password.

Click here to download the demo (Please NOTE that the file size of this download is 20 Mb)

System Compatibility Information

  • MS Windows 95 (or later)
  • MS Windows ME
  • MS Windows NT4 (Sp4 or later)
  • MS Internet Explorer Version 4.01 (SP2)
  • 20mb of disk capacity
  • Not for use with Windows XP

Users' Login

Users' Group & MyNEC Login
Email Address
Password


[password assistance]