Case Studies

All Case Studies

International Criminal Court Permanent Premises, Netherlands

International Criminal Court Permanent Premises, Netherlands

The International Criminal Court (ICC) in The Hague, Netherlands was established by the Rome Statute in 2002.

 

Indira Gandhi International Airport Terminal 3, Delhi, India

Indira Gandhi International Airport Terminal 3, Delhi, India

The new Terminal 3 at Indira Gandhi International Airport south west of New Delhi in India is the eighth largest in the world, with a floor area of over 500,000m2 and capacity of 34 million passengers a year.

 

Landslip prevention and mitigation programme, Hong Kong

Landslip prevention and mitigation programme, Hong Kong

The Hong Kong government’s Civil Engineering and Development Department (CEDD) is trialling the NEC3 Professional Services Contract (PSC) on one of its many landslip prevention and mitigation programme consultancy contracts.

 

London Stadium, UK

London Stadium, UK

The £481 million 80,000-seat London 2012 stadium was the centrepiece of one of the world’s most successful and sustainable Olympic and Paralympic Games. Along with most other venues and infrastructure for the £7.3 billion games, it was procured by the Olympic Delivery Authority using NEC.

 

Luas Cross City line utility diversion works, Dublin, Ireland

Luas Cross City line utility diversion works, Dublin, Ireland

Luas Cross City line is the latest part of the light rail network in Dublin, Ireland. Due for completion in 2017, it will serve a 5.6 km long corridor from the Luas Green line’s central terminus at St Stephen’s Green to Broombridge railway station in the north west.

 

Magnox intermediate level nuclear waste containers, UK

Magnox intermediate level nuclear waste containers, UK

The NEC3 Supply Contract is being used to procure over 2000 cast-iron containers for storing intermediate level nuclear waste generated during the operational and early decommissioning phases of the UK’s now-obsolete Magnox power stations.

 

Harbor Link − Segment 10, Manila North Expressway, Philippines

Harbor Link − Segment 10, Manila North Expressway, Philippines

When Segment 10 of the NLEX Harbor Link opens to traffic towards the end of 2016, it will be the first construction project to have been completed in the Philippines using an NEC contract.

 

Mt Mercer Wind Farm, Australia

Mt Mercer Wind Farm, Australia

Mt Mercer wind farm is the first NEC project undertaken in Australia, successfully completed on time and budget at the end of 2014.

 
Displaying results 105-112 (of 132)
 <  8 9 10 11 12 13 14 15 16 17  > 

Copyright © NEC® Contracts 2014, all rights reserved.
NEC® is a division of Thomas Telford Ltd, the commercial arm of the Institution of Civil Engineers.
Company Reg. No. (Thomas Telford Ltd): 2556636. VAT Reg. No: 240877747.

Institution of Civil Engineers Thomas Telford

This website uses cookies, so that we can provide you with the best user experience.
By continuing to use this website, you are giving consent to cookies being used.
To find out more about which cookies we use and how you can manage them, please see our Cookie Policy