Eastern approaches to Tseung Kwan O−Lam Tin Tunnel, Hong Kong

Eastern approaches to Tseung Kwan O−Lam Tin Tunnel, Hong Kong

The Hong Kong government is using four separate NEC contracts to procure the eastern approaches to its new 2.6km long dual two-lane road tunnel in eastern Hong Kong.

 

Eastern Cape Ports Infrastructure, South Africa

Eastern Cape Ports Infrastructure, South Africa

State-owned freight and logistics company Transnet is responsible for all state-run ports, railways and pipelines in South Africa. It recently completed a major upgrade of its three main Eastern Cape ports using NEC contracts.

 

Energetics Analysis Centre, Porton Down, UK

Energetics Analysis Centre, Porton Down, UK

The UK government’s Defence Science and Technology Laboratory (Dstl) has successfully procured a new explosive materials research centre using NEC.

 

Glenwood School, Essex, UK

Glenwood School, Essex, UK

Completed in August 2017, the 210-place local-authority-maintained facility replaces an existing 150-place school on an adjacent site.

 

Grafham Water Treatment Works Resilience Project, UK

Grafham Water Treatment Works Resilience Project, UK

A £28 million, NEC-procured resilience project was completed for Anglian Water in May 2017 at Grafham Water Treatment Works near Huntingdon in Cambridgeshire.

 

HMNB Clyde Commercial Framework, Scotland, UK

HMNB Clyde Commercial Framework, Scotland, UK

The Ministry of Defence is using an NEC4-based framework to procure a £1.3 billion, 10-year refit of its nuclear submarine base on the Clyde estuary in Scotland.

 

Improvement to Pok Oi interchange, Yuen Long, Hong Kong

Improvement to Pok Oi interchange, Yuen Long, Hong Kong

One of the Hong Kong government’s early pilots of the NEC contract suite was for improving the interchange between Yuen Long Highway (part of Route 9) and Castle Peak Road next to Pok Oi hospital.

 

Ipswich Tidal Barrier, UK

Ipswich Tidal Barrier, UK

The Environment Agency has used NEC contracts to procure a vital new coastal flood defence in eastern England.

 

Jubilee Pool Restoration, Penzance, Cornwall, UK

Jubilee Pool Restoration, Penzance, Cornwall, UK

Jubilee Pool is a spectacular Art Deco lido in Penzance, Cornwall and the largest seawater swimming pool in the UK.

 

Kirkthorpe Hydropower Station, Wakefield, UK

Kirkthorpe Hydropower Station, Wakefield, UK

The NEC-procured Kirkthorpe Hydropower Station at Kirkthorpe Weir on the River Calder in Wakefield, West Yorkshire produces around 2.3 GWh of carbon-dioxide-free electricity a year, equivalent to the consumption of 800 households.

 
Displaying results 21-30 (of 133)
 |<  <  1 2 3 4 5 6 7 8 9 10  >  >| 

This website uses cookies, so that we can provide you with the best user experience.
By continuing to use this website, you are giving consent to cookies being used.
To find out more about which cookies we use and how you can manage them, please see our Cookie Policy