NEC3: Engineering and Construction Contract Option E: cost reimbursable contract

NEC3: Engineering and Construction Contract Option E: cost reimbursable contract
  • Publish Date: 01/04/2013 10:49:14
  • Publisher: Thomas Telford
  • Page Size: 297 x 210
  • Number of Pages: 82
Description
Option E is a cost reinbursable type contract where the financial risk is taken largely by the client.  This document contains all the core clauses and secondary option clauses the schedules of cost components, and contract data, relevant to an option E contract.
 
Construction Clients' Board endorsement of NEC3
 
The Construction Clients' Board (formerly Public Sector Clients' Forum) recommends that public sector organisations use the NEC3 contracts when procuring construction.
 
Standardising use of this comprehensive suite of contracts should help to deliver efficiencies across the public sector and promote behaviours in line with the principles of Achieving Excellence in Construction. 

Copyright Policy
 
Users should note that the NEC Forms of Contract are protected by copyright and may not be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical or photocopying, recording or otherwise, without the prior permission of the copyright owner. However, Contract Data forms may be reproduced for the purpose of obtaining tenders, awarding and administering contracts.

Likewise, plagiarising any copyrighted document is illegal. For users seeking to prepare their own bespoke contracts based on the NEC Forms of Contract, please contact NEC at info@neccontract.com to discuss and obtain a copyright licence.

 

Formats

Paperbound

Our high-quality printed paperbound contract. A delivery charge will be payable.

ePrint

This option is intended for organisations that use the NEC form of contract as their standard route to procurement and administer a number of NEC projects on a day-to-day basis. This option offers the user the ability to access and print unlimited documents for a period of 12 months. It is restricted to a single user on a single machine.

Contents
Core clauses 
• 1 General 
• 2 The Contractor’s main responsibilities 
• 3 Time 
• 4 Testing and Defects 
• 5 Payment 
• 6 Compensation events 
• 7 Title 
• 8 Risks and insurance 
• 9 Termination
 
Dispute resolution W 
• Option W1 
• Option W2
 
Secondary option clauses
• X2   Changes in the law 
• X4   Parent company guarantee 
• X5   Sectional Completion 
• X6   Bonus for early Completion 
• X7   Delay damages 
• X12 Partnering 
• X13 Performance bond 
• X14 Advanced payment to the Contractor 
• X15 Limitation of the Contractor’s liability for his design to reasonable skill and care
• X16 Retention 
• X17 Low performance damages 
• X18 Limitation of liability 
• Y(UK)2 The Housing Grants, Construction and Regeneration Act 1996 
• Y(UK)3 The Contracts (Rights of Third Parties) Act 1999 
• Z     Additional conditions of contract
 
Note Options X1, X3, X8 to X11 and Y(UK)1 are not used
 
Schedule of Cost Components
Shorter Schedule of Cost Components
Contract Data 
Index

Copyright © NEC® Contracts 2018, all rights reserved.
NEC® is a division of Thomas Telford Ltd, the commercial arm of the Institution of Civil Engineers.
Company Reg. No. (Thomas Telford Ltd): 2556636. VAT Reg. No: 240877747.

Institution of Civil Engineers Thomas Telford