Managing Reality, 2nd Edition. Book 5: Managing Procedures

£40.00 Platinum/Gold Users' Group Members £36.00
  • Barry Trebes and Bronwyn Mitch

  • ISBN: 9780727757265
  • Product code: L08809
  • Publish Date: 31/10/2012 15:53:44
  • Publisher: ICE Publishing
  • Page Size: 297 x 210
  • Number of Pages: 90

Managing Reality is a series of books written by NEC experts well versed in using NEC3 in industry that explains how NEC3 can be used to optimum benefit in everyday environments. Ultimately, this suite of books forms the complete and authoritative guide to getting the most from NEC3 for your projects.

The books are based on usage of the NEC’s core document – the Engineering and Construction Contract – although the principles and procedures they discuss apply equally across all the documents in the NEC suite.

Managing Reality, 2nd edition, places great emphasis on offering ‘practical tips’ at appropriate points in the text and highlighted examples. Standard forms are included with their usage explained together with checklists. Managing Reality, 2nd edition, are practical manuals designed to aid both existing and new users in implementing the NEC, vital for anyone involved in preparing, administering or contributing to a NEC contract.

Managing Reality Book 5 Managing Procedures gives step-by-step guidance on how to apply the most commonly used procedures, detailing the actions needed by all parties to comply with the contract. Anyone administering the contract will benefit from this book.




ECC Management: Procedures

1.1 Introduction
1.2 Records to maintain
1.3 Review meetings
1.4 Contract administration
1.5 Practical administration
1.6 How to manage an ECC

Copyright © NEC® Contracts 2014, all rights reserved.
NEC® is a division of Thomas Telford Ltd, the commercial arm of the Institution of Civil Engineers.
Company Reg. No. (Thomas Telford Ltd): 2556636. VAT Reg. No: 240877747.

Institution of Civil Engineers Thomas Telford