NEC3: Engineering and Construction Contract Flow Charts

NEC3: Engineering and Construction Contract Flow Charts
  • Publish Date: 01/04/2013 12:08:38
  • Publisher: Thomas Telford
  • Page Size: 297 x 210
  • Number of Pages: 138
Description
To enable users to understand the operation of the Engineering and Construction Contract, this book contains flow charts which set out the procedural logic of the 75 clauses that can be presented with benefit by flow charting.
 
Construction Clients' Board endorsement of NEC3
 
The Construction Clients' Board (formerly Public Sector Clients' Forum) recommends that public sector organisations use the NEC3 contracts when procuring construction.
 
Standardising use of this comprehensive suite of contracts should help to deliver efficiencies across the public sector and promote behaviours in line with the principles of Achieving Excellence in Construction.

Copyright Policy
 
Users should note that the NEC Forms of Contract are protected by copyright and may not be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical or photocopying, recording or otherwise, without the prior permission of the copyright owner. However, Contract Data forms may be reproduced for the purpose of obtaining tenders, awarding and administering contracts.

Likewise, plagiarising any copyrighted document is illegal. For users seeking to prepare their own bespoke contracts based on the NEC Forms of Contract, please contact NEC at info@neccontract.com to discuss and obtain a copyright licence.

 

Formats

Paperbound

Our high-quality printed paperbound contract

ePrint

ePrint is intended for organisations that use the NEC form of contract as their standard route to procurement and administer a number of NEC projects on a day-to-day basis. This option offers the user the ability to access and print unlimited documents for a period of 12 months.

Contents
Flow charts 
 
• 13 Communications 
• 14 The Project Manager and the Supervisor 
• 15 Adding to the Working Areas 
• 16 Early warning 
• 17 Ambiguities and inconsistencies 
• 18 Illegal and impossible requirements 
• 19 Prevention 
• 20 Providing the Works 
• 21 The Contractor’s design 
• 22 Using the Contractor’s design 
• 23 Design of Equipment 
• 24 People 
• 25 Working with the Employer and Others 
• 26 Subcontracting 
• 27 Other (Contractor) responsibilities 
• 30 Starting, Completion and Key Dates 
• 31 The programme 
• 32 Revising the programme 
• 33 Access to and use of the Site 
• 34 Instruction to stop or not to start work 
• 35 Take over 
• 36 Acceleration 
• 40 Tests and inspections 
• 41 Testing and inspection before delivery 
• 42 Searching for and notifying Defects 
• 43 Correcting Defects 
• 44 Accepting Defects 
• 45 Uncorrected Defects 
• 50 Assessing the amount due S 
• 51 Payment 
• 52 Defined Cost 
• 53 The Contractor’s share (Option C and D) 
• 54 The Activity Schedule (Option A and C) 
• 55 The Bill of Quantities (Option B and D) 
• 60 Compensation events 
• 61 Notifying compensation events 
• 62 Quotations for compensation events 
• 63 Assessing compensation events 
• 64 The Project Manager’s assessments 
• 65 Implementing compensation events 
• 70 The Employer’s title to Plant and Materials 
• 71 Marking Equipment, Plant and Materials outside the Working Areas 
• 72 Removing Equipment 
• 73 Objects and materials within the Site 
• 80 Employer’s risks 
• 81 Contractor’s risk 
• 82 Repairs 
• 83 Indemnity 
• 84 Insurance cover 
• 85 Insurance policies 
• 86 If the Contractor does not insure 
• 87 Insurance by the Employer 
• 90 Termination 
• 91 Reasons for termination 
• 92 Procedures on termination 
• 93 Payment on termination 
• W1 Dispute resolution (used unless Option Y(UK)2 applies) 
• W2 Dispute resolution (used when Option Y(UK)2 applies) 
• X1 Price adjustment for inflation (used only with Options A, B, C and D) 
• X2 Changes in the law 
• X3 Multiple currencies (used only with Options A and B) 
• X4 Parent company guarantee 
• X5 Sectional Completion 
• X6 Bonus for early Completion 
• X7 Delay damages 
• X12 Partnering 
• X13 Performance bond 
• X14 Advanced payment to the Contractor 
• X15 Limitation of the Contractor’s liability for his design to reasonable skill and care
• X16 Retention (not used with Option F) 
X17 Low performance damages 
• X18 Limitation of liability 
• X20 Key Performance Indicators (not used with Option X12) 
• Y(UK)2 The Housing Grants, Construction and Regeneration
Act 1996 
• Y(UK)3 The Contracts (Rights of Third Parties) Act 1999

Copyright © NEC® Contracts 2014, all rights reserved.
NEC® is a division of Thomas Telford Ltd, the commercial arm of the Institution of Civil Engineers.
Company Reg. No. (Thomas Telford Ltd): 2556636. VAT Reg. No: 240877747.

Institution of Civil Engineers Thomas Telford