PSC chosen for Stonehenge bypass design

PSC chosen for Stonehenge bypass design


Highways England has appointed Aecom under an NEC3 Professional Services Contract (PSC) as technical partner for the £1.4 billion A303 Stonehenge bypass scheme. 

The eight-year consultancy contract, worth up to £50 million, is for preliminary design, planning and technical assurance of the detailed design and construction. Mouchel and Mace will work as supply chain partners to Aecom.

The existing 11km single carriageway section of the A303 between Amesbury and Berwick Down bisects the Stonehenge World Heritage site and passes within 100 m of the 5000-year-old monument. It is also a notorious traffic bottleneck.

The proposed option is to replace the single-carriageway with a new 11 km dual carriageway running further to the south and including a 3 km long tunnel. Construction is due to start in 3 years’ time
 
Recent Projects

Recent news

How new rules and NEC are helping us to carry on procuring in a crisis

How new rules and NEC are helping us to carry on procuring in a crisis

In her first editorial as the new NEC Users' Group chair, Tracy Tulloch addresses how NEC can help us continue to procure in disruptive environments.

Read more
NEC annual conference in London attended by over 200 delegates

NEC annual conference in London attended by over 200 delegates

On 16 June 2025, over 200 industry professionals gathered at the historic One Great George Street in London for the NEC annual conference.

Read more
Martin Barnes 2025 Awards honour NEC projects, parties and people

Martin Barnes 2025 Awards honour NEC projects, parties and people

The 2025 Martin Barnes Awards were presented to exemplary projects, parties and individuals at the NEC annual conference on 16 June 2025.

Read more
View all news