Upcoming NEC Training in Asia Pacific 2025

Upcoming NEC Training in Asia Pacific 2025

From introductory NEC training courses to fully accredited programmes, our training supports you at every stage of your NEC journey. Delivered by NEC experts with unrivalled knowledge of the NEC suite of contracts and their use across industry, our courses provide practical insights to enhance project delivery and drive innovation within your organisation. 

Earn the only NEC accreditation that ensures recognition on the official register of accredited professionals, reinforcing your credibility and professional expertise. Recognised worldwide, the NEC Accreditation Suite provides practitioners with advanced technical and practical skills to excel in NEC project leadership roles.

The virtual and blended training courses in Asia Pacific are delivered online in the location's time zone and is also suitable to those outside the region.

For full information and online bookings, click here. Please note, information was correct at the time of writing but may have changed subsequently.

NEC4 Training

Introduction to the NEC4 Engineering and Construction Contract (ECC)

A comprehensive overview of the NEC4 ECC, breaking down its key components for new users.

Date Delivery Format Location
23rd July 2025 Virtual Training Australia

Getting it Right: Preparing the NEC4 ECC

This workshop covers the practicalities of preparing various documents that form the NEC4 ECC including Contract Data, Scope, Site Information and the pricing document to clearly define the obligations and risk allocation.

Date Delivery Format Location
12th August 2025 Virtual Training Australia

Getting it Right: Managing the NEC4 ECC

This workshop covers the key obligations and procedures for managing an NEC4 ECC contract including providing practical guidance on how to implement procedures.

Date Delivery Format Location
5th August 2025 Virtual Training Singapore
30th September 2025 Virtual Training Australia

NEC4 ECC Project Manager Accreditation

This programme is designed to equip delegates with the skills necessary to be able to manage a project under an NEC4 Contract, with specific reference to role and importance of the Project Manager under the NEC4 ECC.

Date Delivery Format Location
17th July 2025 (Fully booked) Classroom Kowloon (Hong Kong)
8th August 2025 Classroom Central (Hong Kong)
1st September 2025 Virtual Training Hong Kong
1st September 2025 Blended Training Singapore
6th September 2025 Classroom Central (Hong Kong)
13th October 2025 Classroom Central (Hong Kong)
20th October 2025 Blended Training Singapore
10th November 2025 Classroom Kowloon (Hong Kong)
1st December 2025 Virtual Training Hong Kong
6th December 2025 Classroom Central (Hong Kong)

NEC4 Term Service Contract (TSC) Service Manager Accreditation

Running over four days and using a mix of learning material including case studies and scenario planning, this programme is designed to equip delegates with the skills necessary to be able to fulfil the role of a Service Manager in the NEC4 TSC.

Date Delivery Format Location
6th September 2025 Classroom Central (Hong Kong)
9th December 2025 Virtual Hong Kong

NEC4 Design Build and Operate Contract (DBOC) Service Manager Accreditation extension

Gain insight into how to use the DBOC, how to put it together, the contract strategy and how it is managed effectively. This course is designed for professionals who have completed either the NEC4 ECC Project Manager Accreditation or NEC4 TSC Service Manager Accreditation and wish to expand their expertise to include the DBOC.

 
Date Delivery Format Location
5th September 2025 Virtual Training Hong Kong

NEC3 to NEC4 ECC Project Manager Accreditation extension

One day of tutor-led training, which includes group working on case studies, to draw out the different processes in the NEC4 Engineering and Construction Contract (ECC) compared to the NEC3 ECC.

Date Delivery Format Location
8th September 2025 Virtual Training Hong Kong
3rd December 2025 Virtual Training Hong Kong
Recent Projects

Recent news

How new rules and NEC are helping us to carry on procuring in a crisis

How new rules and NEC are helping us to carry on procuring in a crisis

In her first editorial as the new NEC Users' Group chair, Tracy Tulloch addresses how NEC can help us continue to procure in disruptive environments.

Read more
NEC annual conference in London attended by over 200 delegates

NEC annual conference in London attended by over 200 delegates

On 16 June 2025, over 200 industry professionals gathered at the historic One Great George Street in London for the NEC annual conference.

Read more
Martin Barnes 2025 Awards honour NEC projects, parties and people

Martin Barnes 2025 Awards honour NEC projects, parties and people

The 2025 Martin Barnes Awards were presented to exemplary projects, parties and individuals at the NEC annual conference on 16 June 2025.

Read more
View all news