Al Raha, Abu Dhabi, UAE

Al Raha, Abu Dhabi, UAE

Al Raha Beach is a 500ha mixed-use waterfront development adjacent the main highway leading into Abu Dhabi from Dubai in the United Arab Emirates. Around 70% of the 11km long development is being built on reclaimed land and islands.

The original scheme comprises eleven mixed-used precincts of marinas, hotels, shops, offices, houses and apartments up to 40 storeys high, with accommodation for over 120,000 people. Infrastructure requirements include six major interchanges with the existing highway; 75 bridges; extensive road, light rail and canal networks; and service installations.

Pioneering NEC3 in the Middle East

In 2007 leading United Arab Emirates developer Aldar Properties took the pioneering step of adopting NEC3 to procure the development, believed to be the first time the contract has been used anywhere in the Middle East.

"Implementation of the NEC throughout the complete supply chain at the Al Raha Beach development is not only a first but also a massive step forward in the region," said Aldar Development Director Michael Cox. "We believe the NEC will attract world-class vendors required for the efficient and timely delivery of the Al Raha Beach development." 

Completions in first three years

The main elements of the 500ha development set up in November 2006 under Managing Director Christopher Wilkinson and delivered by Aldar's joint venture Aldar Laing ORourke under NEC3 contracts have been:

  • Aldar's new headquarters building
  • The Al Bandar residential precinct
  • Roads and interchanges with steel and concrete bridges
  • Utilities and other infrastructure.

Site services such as workforce accommodation and catering were also provided under NEC3 Term Service Contacts.

In 2008 Aldar had to react to the world economic downturn leading to many of the Al Raha Beach projects being postponed or being subject to rationalisation. However, NEC3 contracts are still being used on the extension to the existing Al Zeina precinct scope, which was covered by a new contract awarded in early 2010.

Benefits of Using NEC

  • Providing a common procurement approach throughout the supply chain, ranging from consultant's appointments, main contarcts, sub contracts, delivery frameworks and term contracts for site services
  • Higher degree of fairness to all parties attracts world class suppliers and management staff.
  • Greater ease of understanding contract terms and conditions.

 

Recent Projects

Recent projects

Emergency and Urgent Care Campus at Stepping Hill Hospital, Stockport, UK

Emergency and Urgent Care Campus at Stepping Hill Hospital, Stockport, UK

NEC has been used to transform the emergency department of a major hospital in northwest England.

Read more
Clyde waterfront and Renfrew riverside, Scotland, UK

Clyde waterfront and Renfrew riverside, Scotland, UK

NEC has been used to deliver new infrastructure to regenerate the Clydebank waterfront and Renfrew riverside areas in Scotland, UK.

Read more
King Nyabela Hospital, Middelburg, South Africa

King Nyabela Hospital, Middelburg, South Africa

NEC has been used to deliver a new fully equipped 220-bed district hospital in Mpumalanga Province, South Africa.

Read more
View all projects