Case Studies

All Case Studies

Waterworks River sewer bridge reconstruction, London, UK

Waterworks River sewer bridge reconstruction, London, UK

Seven NEC subcontracts have been used to reconstruct a vital 160-year-old bridge in Stratford, east London.

 

Welsh National Sailing Academy and Events Centre, Pwllheli, Wales, UK

Welsh National Sailing Academy and Events Centre, Pwllheli, Wales, UK

‘Plas Heli’ on the southern coast of the Llyn Peninsula in Gwynedd, north-west Wales is home to the Welsh National Sailing Academy and a major events centre.

 

Werrington Brook Improvement Project, Peterborough, UK

Werrington Brook Improvement Project, Peterborough, UK

The Environment Agency has completed a highly sensitive, NEC-procured urban watercourse improvement in Peterborough, Cambridgeshire, UK.

 

West Kowloon Drainage Improvement − Inter-Reservoirs Transfer Scheme, Hong Kong

West Kowloon Drainage Improvement − Inter-Reservoirs Transfer Scheme, Hong Kong

Hong Kong’s Drainage Services Department (DSD) is using an NEC contract to build a major water tunnel between two existing freshwater reservoirs.

 

Wigan Bus Station, UK

Wigan Bus Station, UK

NEC contracts have been used to deliver a new state-of-the-art bus station serving over 100,000 people in the town of Wigan in Greater Manchester, northwest England.

 

British Airways i360, Brighton, UK

British Airways i360, Brighton, UK

Prince Phillip, the Duke of Edinburgh, officially opened the £46 million NEC-procured British Airways i360 tourist attraction in Brighton, UK in October 2016. The 162 m tall structure is the world’s first vertical cable car, the tallest moving observation tower and the most slender tower ever built. ‘Flights’ on the 18 m diameter glass observation pod carry up to 200 passengers up and down the 3.9 m diameter steel tower every half hour.

 

Crossrail, London, UK

Crossrail, London, UK

Crossrail is one of the largest infrastructure projects of its kind currently being undertaken in Europe. It is building 42km of tunnels, 10 new stations and improving 30 more. The finished railway, which will be named the Elizabeth line when it opens in central London in 2018, will be a fully accessible route of 40 stations from Reading and Heathrow in the west to Shenfield and Abbey Wood in the east.

 

Heathrow T2 & 5C, London, UK

Heathrow T2 & 5C, London, UK

Heathrow Airport Limited has signed an £812 million contract for the design and construction of a new green Terminal 2 building at Heathrow Airport in London.

 
Displaying results 81-88 (of 162)
 <  7 8 9 10 11 12 13 14 15 16  > 

This website uses cookies, so that we can provide you with the best user experience.
By continuing to use this website, you are giving consent to cookies being used.
To find out more about which cookies we use and how you can manage them, please see our Cookie Policy