Case Studies

All Case Studies

Hammersmith Flyover Phase 2 Strengthening, London, UK

Hammersmith Flyover Phase 2 Strengthening, London, UK

Completed in September 2015, the NEC-procured phase 2 strengthening of the 622 m long, 16-span Hammersmith Flyover in west London, UK was an extraordinarily complex and demanding project. It was highly commended in the NEC Large Project of the Year award in 2016.

 

Hong Kong Academy, Hong Kong

Hong Kong Academy, Hong Kong

Hong Kong Academy is an independent, non-profit, co-educational day school for over 560 children aged from 3 to 18 years. In August 2013 the school moved to a new purpose-built campus at Sai Kung in the New Territories, marking successful delivery of Asia's first private-sector NEC project.

 

Humber Bridge A-frame rocker bearing replacement, UK

Humber Bridge A-frame rocker bearing replacement, UK

Britain’s 2.2 km long Humber Bridge carries the A15 dual carriageway over the Humber estuary between Hessle in East Yorkshire and Barton in North Lincolnshire. Opened in 1981, its 1410 m suspended main span it made it the world’s longest single-span bridge until 1997.

 

Hunua 4 Water Main, New Zealand

Hunua 4 Water Main, New Zealand

Watercare provides water and wastewater services to around 1.5 million people in the Auckland region of North Island, New Zealand. The company commissioned the Hunua 4 water main project as part of its long-term supply strategy to cater for the region’s future growth.

 

International Criminal Court Permanent Premises, Netherlands

International Criminal Court Permanent Premises, Netherlands

The International Criminal Court (ICC) in The Hague, Netherlands was established by the Rome Statute in 2002.

 

Indira Gandhi International Airport Terminal 3, Delhi, India

Indira Gandhi International Airport Terminal 3, Delhi, India

The new Terminal 3 at Indira Gandhi International Airport south west of New Delhi in India is the eighth largest in the world, with a floor area of over 500,000m2 and capacity of 34 million passengers a year.

 

Landslip prevention and mitigation programme, Hong Kong

Landslip prevention and mitigation programme, Hong Kong

The Hong Kong government’s Civil Engineering and Development Department (CEDD) is trialling the NEC3 Professional Services Contract (PSC) on one of its many landslip prevention and mitigation programme consultancy contracts.

 

London Stadium, UK

London Stadium, UK

The £481 million 80,000-seat London 2012 stadium was the centrepiece of one of the world’s most successful and sustainable Olympic and Paralympic Games. Along with most other venues and infrastructure for the £7.3 billion games, it was procured by the Olympic Delivery Authority using NEC.

 
Displaying results 121-128 (of 152)
 <  10 11 12 13 14 15 16 17 18 19  > 

This website uses cookies, so that we can provide you with the best user experience.
By continuing to use this website, you are giving consent to cookies being used.
To find out more about which cookies we use and how you can manage them, please see our Cookie Policy