Build/Design & Build Case Studies

More Case Studies

A14 Cambridge to Huntingdon improvement scheme, UK

A14 Cambridge to Huntingdon improvement scheme, UK

The £1.5 billion A14 Cambridge to Huntingdon improvement scheme in eastern England is being delivered using NEC.

 

A4232 Eastern Bay Link, Cardiff, UK

A4232 Eastern Bay Link, Cardiff, UK

The NEC-procured Eastern Bay Link provides a vital new 1.2 km dual carriageway through the Cardiff Docks area.

 

A683 Bay Gateway, Lancashire, UK

A683 Bay Gateway, Lancashire, UK

The council chose NEC3 contracts to procure what was one of the UK’s largest local authority road projects in recent years.

 

A9/A85 Junction and Link Road to Bertha Park, Perth, Scotland

A9/A85 Junction and Link Road to Bertha Park, Perth, Scotland

Perth & Kinross Council has successfully used an NEC contract to deliver the first phase of its Perth Transport Futures Project.

 

Area 54, Tuen Mun, Hong Kong

Area 54, Tuen Mun, Hong Kong

Area 54 in Tuen Mun is a major Hong Kong government project to provide building land and infrastructure to meet long-term housing demand. The final HK$428 million (£45 million) phase is being procured using NEC.

 

Basildon University Hospital rainwater retention, Essex, UK

Basildon University Hospital rainwater retention, Essex, UK

Essex County Council has used NEC to trial an EU project for reducing flood risk in built-up areas.

 

Battersea Cable Tunnel, London, UK

Battersea Cable Tunnel, London, UK

A strategic 330 m long high-voltage electricity cable tunnel has been successfully delivered in central London using NEC contracts.

 

Beech Grove Primary School expansion, Somerset, UK

Beech Grove Primary School expansion, Somerset, UK

Beech Grove Primary School, Courtlands Road, Wellington, Somerset, UK

 

Brize Norton A400M hangar, UK

Brize Norton A400M hangar, UK

The UK government has used NEC to procure a state-of-the-art maintenance hangar for the Royal Air Force’s new fleet of 22 Airbus A400M Atlas transport aircraft

 

Guy's Hospital, Great Maze Pond, London, UK

Guy's Hospital, Great Maze Pond, London, UK

The NEC-procured Cancer Centre on a confined triangular site at Guy’s Hospital in central London is designed to be a ‘hospital that does not feel like a hospital’.

 
Displaying results 1-10 (of 154)
 |<  < 1 2 3 4 5 6 7 8 9 10  >  >| 

NEC DIARY
(EVENTS & TRAINING)

ECC Project Manager Accreditation

NEC training

Get the advanced skills necessary to be able to successfully manage a project using the NEC Engineering and Construction Contract (ECC), and become part of a unique group of accredited NEC professionals.

Read more

Related Products

NEC3: Engineering and Construction Contract Bundle

NEC3: Engineering and Construction Contract Bundle

This special bundle contains everything needed to run a civil and building construction project.

Buy now

This website uses cookies, so that we can provide you with the best user experience.
By continuing to use this website, you are giving consent to cookies being used.
To find out more about which cookies we use and how you can manage them, please see our Cookie Policy