Build/Design & Build Case Studies

More Case Studies

Beanfield and Gretton Primary Schools, UK

Beanfield and Gretton Primary Schools, UK

Completed on time in just 9 weeks, this small but challenging NEC-procured school refurbishment project in Northamptonshire, UK won the NEC Small Project of the Year Award in 2016.

 

East London Line, London, UK

East London Line, London, UK

Providing Transport for London with a compete operating railway system in just three and a half years.

 

Felixstowe Seafront Gardens, UK

Felixstowe Seafront Gardens, UK

Felixstowe Seafront Gardens is a 1 km long public park in the seaside resort of Felixstowe in Suffolk, UK. Created over 100 years ago, the beautifully landscaped and sumptuously planted grade II registered park has recently been extensively restored by Suffolk Coastal District Council as part of a town-wide regeneration programme.

 

Giants' Causeway Visitors' Centre, Northern Ireland

Giants' Causeway Visitors' Centre, Northern Ireland

Giants' Causeway on the coast of County Antrim, Northern Ireland was formed around 60 million years ago when molten magma cooled to form nearly 40,000 interlocking basalt columns up to 12m tall.

 

Hammersmith Flyover Phase 2 Strengthening, London, UK

Hammersmith Flyover Phase 2 Strengthening, London, UK

Completed in September 2015, the NEC-procured phase 2 strengthening of the 622 m long, 16-span Hammersmith Flyover in west London, UK was an extraordinarily complex and demanding project. It was highly commended in the NEC Large Project of the Year award in 2016.

 

Hong Kong Academy, Hong Kong

Hong Kong Academy, Hong Kong

Hong Kong Academy is an independent, non-profit, co-educational day school for over 560 children aged from 3 to 18 years. In August 2013 the school moved to a new purpose-built campus at Sai Kung in the New Territories, marking successful delivery of Asia's first private-sector NEC project.

 

Humber Bridge A-frame rocker bearing replacement, UK

Humber Bridge A-frame rocker bearing replacement, UK

Britain’s 2.2 km long Humber Bridge carries the A15 dual carriageway over the Humber estuary between Hessle in East Yorkshire and Barton in North Lincolnshire. Opened in 1981, its 1410 m suspended main span it made it the world’s longest single-span bridge until 1997.

 

Hunua 4 Water Main, New Zealand

Hunua 4 Water Main, New Zealand

Watercare provides water and wastewater services to around 1.5 million people in the Auckland region of North Island, New Zealand. The company commissioned the Hunua 4 water main project as part of its long-term supply strategy to cater for the region’s future growth.

 

International Criminal Court Permanent Premises, Netherlands

International Criminal Court Permanent Premises, Netherlands

The International Criminal Court (ICC) in The Hague, Netherlands was established by the Rome Statute in 2002.

 

Indira Gandhi International Airport Terminal 3, Delhi, India

Indira Gandhi International Airport Terminal 3, Delhi, India

The new Terminal 3 at Indira Gandhi International Airport south west of New Delhi in India is the eighth largest in the world, with a floor area of over 500,000m2 and capacity of 34 million passengers a year.

 
Displaying results 111-120 (of 141)
 |<  <  6 7 8 9 10 11 12 13 14 15  >  >| 

NEC DIARY
(EVENTS & TRAINING)

ECC Project Manager Accreditation

NEC training

Get the advanced skills necessary to be able to successfully manage a project using the NEC Engineering and Construction Contract (ECC), and become part of a unique group of accredited NEC professionals.

Read more

Related Products

NEC3: Engineering and Construction Contract Bundle

NEC3: Engineering and Construction Contract Bundle

This special bundle contains everything needed to run a civil and building construction project.

Buy now

This website uses cookies, so that we can provide you with the best user experience.
By continuing to use this website, you are giving consent to cookies being used.
To find out more about which cookies we use and how you can manage them, please see our Cookie Policy