Build/Design & Build Case Studies

More Case Studies

Much Wenlock Flood Alleviation Scheme, UK

Much Wenlock Flood Alleviation Scheme, UK

Shropshire Council has used NEC to reduce the flood risk to 171 houses in Much Wenlock near Telford.

 

Network Rail’s Dover Sea Wall emergency reconstruction project, UK

Network Rail’s Dover Sea Wall emergency reconstruction project, UK

Network Rail had to shut its coastal railway between Dover and Folkestone on 24 December 2015 after a violent storm damaged a supporting sea wall, causing 250 m of track to collapse. A £36 million, NEC-procured project enabled the line to re-open on 5 September 2016, three months ahead of a challenging fast-track schedule.

 

New Campuses, Southern Regional College, Northern Ireland

New Campuses, Southern Regional College, Northern Ireland

Southern Regional College in Northern Ireland is delivering three new state-of-the-art campuses between 2018 and 2022 using NEC contracts. The College won the NEC Client of the Year in 2018 for its innovative use of the contracts to deliver a wide range of curriculum innovations and digital assets in addition to the physical buildings.

 

Northern Spire, Sunderland, UK

Northern Spire, Sunderland, UK

The Northern Spire is a new road crossing over the River Wear in the city of Sunderland, north-east England.

 

Nucleus (the Nuclear and Caithness Archives), UK

Nucleus (the Nuclear and Caithness Archives), UK

The extensive records of Britain’s nuclear power industry are gradually being transferred to a new NEC-procured archive building on a remote site in northern Scotland.

 

Overnight beach lodges, Bournemouth, UK

Overnight beach lodges, Bournemouth, UK

Bournemouth Beach Lodges is a £1.7 million development of 15 NEC-procured overnight-stay beach huts at Boscombe beach in Dorset, southern England.

 

Oxygen Train 17 integration, Secunda, South Africa

Oxygen Train 17 integration, Secunda, South Africa

Oxygen Train 17 at international chemical and energy company Sasol’s Secunda operations in Mpumalanga, South Africa is the largest oxygen production unit in the world. Producing 5000 t per day, Air Liquide’s giant air separation unit was integrated into Sasol’s synthetic fuel and chemical manufacturing operations using 20 NEC contracts.

 

Pithara section, Great Northern Highway Muchea to Wubin upgrade, Australia

Pithara section, Great Northern Highway Muchea to Wubin upgrade, Australia

NEC has been successfully trialled on a road project in Western Australia − a new 16km stretch of the Great Northern Highway in the semi-arid Wheatbelt region, north of Perth.

 

Pooley Bridge, Cumbria, UK

Pooley Bridge, Cumbria, UK

Cumbria County Council has used NEC contracts to procure the UK’s first stainless steel road bridge. The new 40 m crossing over the River Eamont at the village of Pooley Bridge is a permanent replacement for an eighteenth-century stone bridge that was swept away by floodwater in 2015.

 

Protos Phase I Infrastructure, Cheshire, UK

Protos Phase I Infrastructure, Cheshire, UK

Protos is a 54 ha energy, innovation and industrial park near Ellesmere Port in Cheshire, northwest England.

 
Displaying results 41-50 (of 133)
 |<  <  1 2 3 4 5 6 7 8 9 10  >  >| 

This website uses cookies, so that we can provide you with the best user experience.
By continuing to use this website, you are giving consent to cookies being used.
To find out more about which cookies we use and how you can manage them, please see our Cookie Policy