Managing Reality, 2nd Edition. Book 1: Introduction to the Engineering and Construction Contract

 
£42.50 Platinum/Gold Users' Group Members £38.25
  • Barry Trebes and Bronwyn Mitch

  • ISBN: 9780727757180
  • Product code: L08805
  • Publish Date: 31/10/2012 11:43:15
  • Publisher: ICE Publisher
  • Page Size: 297 x 210
  • Number of Pages: 104
Quantity
Description

Managing Reality is a series of books written by NEC experts well versed in using NEC3 in industry that explains how NEC3 can be used to optimum benefit in everyday environments. Ultimately, this suite of books forms the complete and authoritative guide to getting the most from NEC3 for your projects.

The books are based on usage of the NEC’s core document – the Engineering and Construction Contract – although the principles and procedures they discuss apply equally across all the documents in the NEC suite.

Managing Reality, 2nd edition, places great emphasis on offering ‘practical tips’ at appropriate points in the text and highlighted examples. Standard forms are included with their usage explained together with checklists. Managing Reality, 2nd edition, are practical manuals designed to aid both existing and new users in implementing the NEC, vital for anyone involved in preparing, administering or contributing to a NEC contract.
 

Contents

Preface
Foreword

Introduction to the Engineering and Construction Contract, concepts and terminology

1.1 Introduction
1.2 What is the ECC?
ICE Conditions of Contract Withdraw
1.3 Why is the ECC different?
1.4 ECC structure
1.5 Conventions
1.6 Concepts
1.7 Terminology
1.8 Terminology not used in the ECC
1.9 Commentary on other aspects of the ECC
1.10 How does the ECC affect the way you work?
1.11 Summarising the ECC
1.12 Potential benefits

Roles in the Engineering and Construction Contract

2.1 Introduction
2.2 Roles in the ECC
2.3 How to designate a role
2.4 Separation of roles and responsibilities
2.5 Other roles in the ECC
2.6 The project team
2.7 What does the ECC mean to me
2.8 Delegation
2.9 Replacement of personnel

Appendix: List of duties
Index

This website uses cookies, so that we can provide you with the best user experience.
By continuing to use this website, you are giving consent to cookies being used.
To find out more about which cookies we use and how you can manage them, please see our Cookie Policy