NEC4: Products NEC4: Contracts NEC4: Guidance Notes & Flow Charts NEC4: Preparing an Engineering and Construction Short Contract

NEC4: Preparing an Engineering and Construction Short Contract

NEC4: Preparing an Engineering and Construction Short Contract
Choose Format:
For Corporate packages please call +44 (0)20 7665 2446




Get this for £ with Platinum/Gold Users' Group Members
Max quantity of 1
Description

This document will provide guidance on the contract preparation for an Engineering and Construction Short Contract (ECSC).

Copyright Policy

Users should note that the NEC Forms of Contract are protected by copyright and may not be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical or photocopying, recording or otherwise, without the prior permission of the copyright owner. However, Contract Data forms may be reproduced for the purpose of obtaining tenders, awarding and administering contracts.

Likewise, plagiarising any copyrighted document is illegal. For users seeking to prepare their own bespoke contracts based on the NEC Forms of Contract, please contact NEC at info@neccontract.com to discuss and obtain a copyright licence.

Contents
Chapter 1 Contract documents
 
Chapter 2 Contract Data
  • 2.1 Introduction
  • 2.2 Contract Data checklist
  • 2.3 Additional conditions of contract
 
Chapter 3 Scope
  • 3.1 The status of the Scope
  • 3.2 Drafting Scope
  • 3.3 ECSC references to Scope
  • 3.4 Client’s Scope
 
Chapter 4 Site Information
  • 4.1 The status of the Site Information
  • 4.2 Drafting Site Information
  • 4.3 ECSC references to the Site Information
  • 4.4 Site Information
 
Chapter 5 Price List
 
Chapter 6 Engineering and Construction Short Subcontract
  • 6.1 Introduction
  • 6.2 Terminology
  • 6.3 Subcontract Data checklist
  • 6.4 Subcontract Scope
 
Appendix 1 Contract Data – Worked Example
Publish Date:
Page Size:
ISBN:
01/06/2017 00:00:00
297 x 210
Publisher:
Number of Pages:
Product Code:
Thomas Telford
-

This website uses cookies, so that we can provide you with the best user experience.
By continuing to use this website, you are giving consent to cookies being used.
To find out more about which cookies we use and how you can manage them, please see our Cookie Policy