NEC4: Engineering and Construction Contract Option C: target contract with activity schedule

NEC4: Engineering and Construction Contract Option C:  target contract with activity schedule

Paperbound gives you
  • Our high-quality printed paperbound contract
Paperbound doesn't give you
  • The ability to print your contract
  • A digital copy of this contract
eView gives you
  • Digital document versions to view and search for a period of up to 12 months.
eView doesn't give you
  • The ability to print your contract
  • Access for multiple users or devices
ePrint gives you
  • Digital documents that can be accessed and printed for a period of 12 months
  • The flexibility to administer a number of NEC projects on a day-to-day basis
ePrint doesn't give you
  • Access for multiple users or devices
  • Cannot be used for third party training, conferences or in the external digital environment

1

£72.00

Contact sales

Get this for £65.00 with Platinum/Gold Users' Group Membership

The NEC4 Engineering and Construction Contract (ECC) Option C is the target cost main works contract with an activity schedule. It can include any level of design, and is ideal for more complex or larger projects where the client and contractor are willing to share project financial risk in a fully collaborative way.

The contractor prices activities in the client’s activity schedule based on actual cost plus a fee, resulting in a target price. The client makes interim payments on completion of each activity and differences from the target price are shared according to an agreed pain/gain share proportion. This directly incentivises both parties to look for cost savings throughout the works.

The document contains everything you need to prepare, tender and manage an NEC4 ECC Option C contract, including all relevant secondary options and forms for the cost schedule and contract data.

Background

The NEC4 ECC is the main works contract in the NEC4 suite of collaborative, flexible and clearly written contracts for built environment procurement. It has a global track record for delivering all kinds and sizes of building and infrastructure projects on time, on budget and to the highest environmental and quality standards.

As with all NEC4 contracts, the parties are required to act in a ‘spirit of mutual trust and co-operation’ and give early warnings of anything that could affect time, cost or quality so it can be mitigated without delay. Change is dealt with by a fast and fair compensation event process which, together with a continually updated and agreed programme, ensures there are no surprises at completion.

Project building

Projects that have used this contract

Universal accessibility lift-retrofit projects, Hong Kong

Universal accessibility lift-retrofit projects, Hong Kong

Read more
Phase 2 London power tunnel and shafts, UK

Phase 2 London power tunnel and shafts, UK

Read more
Littleborough under-railway flood culvert, UK

Littleborough under-railway flood culvert, UK

Read more
Siu Ho Wan Water Treatment Works extension, Hong Kong

Siu Ho Wan Water Treatment Works extension, Hong Kong

Read more