NEC工程及建造合約(ECC)香港版(繁體中文)
《NEC工程及建造合約》(ECC)香港版(以NEC4 ECC為基礎)的官方繁體中文譯本由NEC與香港發展局共同製作,以支援該合約在香港的採用。 The official Traditional Chinese translation of the NEC Engineering and Construction Contract (ECC) Hong Kong Edition (based on the NEC4 ECC) has been produced by NEC with the Hong Kong Development Bureau, to support adoption in Hong Kong.