NEC 工程及建造合同(ECC)香港版(简体中文版)
《NEC工程及建造合同(ECC)香港版》(NEC Engineering and Construction Contract (ECC) Hong Kong Edition)(基于NEC4工程及建造合同)官方简体中文译本由NEC与香港发展局、前海管理局携手打造,旨在支持这一国际先进合同标准在中国大陆的广泛应用。 The official Simplified Chinese translation of the NEC Engineering and Construction Contract (ECC) Hong Kong Edition (based on the NEC4 ECC) has been produced by NEC with the Hong Kong Development Bureau and Qianhai Authority, to support adoption across Mainland China.