NEC4: Preparing an Engineering and Construction Contract
This document will provide guidance on the contract preparation for an Engineering and Construction Contract (ECC).
Chapter 2 Contract Data
- 2.1 Introduction
- 2.2 Contract Data checklist
- 2.3 Using Option Z: additional conditions of contract
Chapter 3 Scope
- 3.1 The status of the Scope
- 3.2 Drafting Scope
- 3.3 ECC references to Scope
- 3.4 Client’s Scope
- 3.5 Scope provided by the Contractor for its design
Chapter 4 Site Information
- 4.1 The status of the Site Information
- 4.2 Drafting Site Information
- 4.3 ECC references to the Site Information
- 4.4 Site Information
Chapter 5 Pricing documents
- 5.1 Introduction
- 5.2 Activity Schedule (Options A and C)
- 5.3 Bill of Quantities (Options B and D)
Chapter 6 Form of agreement
Chapter 7 Engineering and Construction Subcontract
- 7.1 Introduction
- 7.2 Terminology
- 7.3 Subcontract Data checklist
- 7.4 Subcontract Scope
Appendix 1 Contract Data – Worked Example
Users should note that the NEC Forms of Contract are protected by copyright and may not be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical or photocopying, recording or otherwise, without the prior permission of the copyright owner. However, Contract Data forms may be reproduced for the purpose of obtaining tenders, awarding and administering contracts.
Likewise, plagiarising any copyrighted document is illegal. For users seeking to prepare their own bespoke contracts based on the NEC Forms of Contract, please contact NEC at info@neccontract.com to discuss and obtain a copyright licence.
Paperbound (Hardcopy)
Product code: L48051-LATAM-HC
ISBN:
9781916735118
Paperbound (Hardcopy)
Product code: L48051-H
ISBN:
9780727762245
ePrint (ePrint)
Product code: L48051-P
ISBN:
9780727762801
eView (eView)
Product code: L48051-V
ISBN:
9780727762801