Upcoming NEC Training in Asia Pacific 2025

Upcoming NEC Training in Asia Pacific 2025

From introductory NEC training courses to fully accredited programmes, our training supports you at every stage of your NEC journey. Delivered by NEC experts with unrivalled knowledge of the NEC suite of contracts and their use across industry, our courses provide practical insights to enhance project delivery and drive innovation within your organisation. 

Earn the only NEC accreditation that ensures recognition on the official register of accredited professionals, reinforcing your credibility and professional expertise. Recognised worldwide, the NEC Accreditation Suite provides practitioners with advanced technical and practical skills to excel in NEC project leadership roles.

The virtual and blended training courses in Asia Pacific are delivered online in the location's time zone and is also suitable to those outside the region.

For full information and online bookings, click here. Please note, information was correct at the time of writing but may have changed subsequently.

NEC4 Training

Introduction to the NEC4 Engineering and Construction Contract (ECC)

A comprehensive overview of the NEC4 ECC, breaking down its key components for new users.

Date Delivery Format Location
30th September 2025 (Full) Virtual Training Australia

NEC4 ECC Project Manager Accreditation

This programme is designed to equip delegates with the skills necessary to be able to manage a project under an NEC4 Contract, with specific reference to role and importance of the Project Manager under the NEC4 ECC.

Date Delivery Format Location
13th October 2025 (Full) Classroom Central (Hong Kong)
20th October 2025 (Full) Blended Training Singapore
10th November 2025 (Full) Classroom (delivered in Cantonese) Kowloon (Hong Kong)
1st December 2025 Virtual Training Hong Kong
4th December 2025 Virtual Training (delivered in Cantonese) Hong Kong
6th December 2025 Classroom Central (Hong Kong)

NEC4 Term Service Contract (TSC) Service Manager Accreditation

Running over four days and using a mix of learning material including case studies and scenario planning, this programme is designed to equip delegates with the skills necessary to be able to fulfil the role of a Service Manager in the NEC4 TSC.

Date Delivery Format Location
9th December 2025 Virtual Hong Kong

NEC4 Design Build and Operate Contract (DBOC) Service Manager Accreditation extension

Gain insight into how to use the DBOC, how to put it together, the contract strategy and how it is managed effectively. This course is designed for professionals who have completed either the NEC4 ECC Project Manager Accreditation or NEC4 TSC Service Manager Accreditation and wish to expand their expertise to include the DBOC.

 
Date Delivery Format Location
12th December 2025 Virtual Training Hong Kong

NEC3 to NEC4 ECC Project Manager Accreditation extension

One day of tutor-led training, which includes group working on case studies, to draw out the different processes in the NEC4 Engineering and Construction Contract (ECC) compared to the NEC3 ECC.

Date Delivery Format Location
3rd December 2025 Virtual Training Hong Kong

NEC4 ECC PMA to TSC Service Manager Accreditation Extension

This one-day course bridges the gap between the NEC4 ECC and the NEC4 TSC, providing the knowledge and skills needed to manage service contracts effectively. This course is only for NEC4 ECC Accredited Project Managers in Hong Kong who want to expand their capability and achieve NEC4 TSC Accredited Service Manager status.

Date Delivery Format Location
17th December 2025 Virtual Training Hong Kong
Recent Projects

Recent news

Richard Patterson – 100 not out for NEC

Richard Patterson – 100 not out for NEC

With this issue of the NEC Insights Briefing, Richard Patterson has now racked up an astonishing 100 contributions. We therefore thought it was time to learn more about the man behind it all.

Read more
NEC in the UK dredging sector: how to use Option selection and Contract Data to make it work

NEC in the UK dredging sector: how to use Option selection and Contract Data to make it work

NEC has become a mainstream form for UK dredging/coastal works, but it is not ‘one-Option-fits-all’. David Kinlan & Richard Patterson review how Option selection and Contract Data should be used.

Read more
Building better together: evolving construction contracts from adversarial to collaborative

Building better together: evolving construction contracts from adversarial to collaborative

Over the last three decades, collaboration has moved from being a desirable aspiration in construction projects to an explicit objective.

Read more
View all news